SAMPLE DESIGN · Made-up business, sample reviews · Get one like this
LintelBuilders (555) 555-0191 Ask for a home visit

Kitchens, baths and additions, planned to the week.

A remodeling crew of five in Niceton, AZ. A written schedule before we start, one project manager the whole way, and photos every Friday.

4.9 from 63 Google reviews (sample) AZ ROC license #000000 (sample)

AZ ROC license #000000 (sample). Licensed, bonded and insured.

Finished kitchen remodel: white oak cabinets, a long quartz island under black pendant lights, open to the family room
ProjectKitchen and family room
WhereAgave Way, Niceton
Schedule10 weeks
FinishedWeek 10
Design, permit, buildDone the week we planned

Plan your project

Two taps and you'll see a rough price range and how the weeks usually go. Nate firms it up after a visit to your house.

What are we building?
How big a change?
Rough range (sample prices)$45,000 to $80,000
First meeting to walkthroughAbout 15 weeks

Design and choices weeks 1 to 4, permit weeks 5 to 7, building weeks 8 to 15.

Most people live at home through a kitchen remodel. We set up a small temporary kitchen in another room.

Cabinets and counters move the price the most.

Sample prices for a made-up business. Your site shows your real ranges.

Every project type with a rough range and schedule
ProjectChangeRough range (sample)Weeks
KitchenNew look, same layout$28,000 to $45,000About 9
KitchenMove things around$45,000 to $80,000About 15
KitchenOpen it up$75,000 to $130,000About 20
BathroomNew look, same layout$14,000 to $24,000About 6
BathroomTub to walk-in shower$24,000 to $42,000About 10
BathroomDown to the studs$38,000 to $65,000About 12
AdditionOne room$85,000 to $140,000About 26
AdditionRoom and a bath$130,000 to $210,000About 31
AdditionCasita$160,000 to $260,000About 36
Whole homeFinishes everywhere$70,000 to $120,000About 17
Whole homeKitchen, baths and floors$140,000 to $240,000About 26
Whole homeDown to the studs$250,000 to $420,000About 38

Five people, and you know all of them

Nate started Lintel in 2013 after twelve years framing houses. We take on four or five projects at a time, so the same crew stays on yours from demo day to the last cabinet knob.

The Lintel crew of five in matching blue work shirts on the driveway of a house they are remodeling
From left: Nate Hollister, owner. Victor Ramos, project manager. Jamal Wright, lead carpenter. Rudy Salas, tile and finish. Tyler Ness, carpenter.
Nate Hollister pointing at a printed floor plan on a kitchen table

Nate plans it

Nate Hollister, owner and general contractor

He walks your house, measures, draws the plan with you and writes the price and the schedule. He's back for the final walkthrough.

Victor Ramos showing a tablet to two homeowners in a framed-out room

Victor runs it

Victor Ramos, project manager

Your one contact from start to finish. He books the inspections, orders the materials, and texts you photos and what's next every Friday.

Jamal Wright and Tyler Ness raising a framed wall for a room addition

Our crew builds it

Jamal Wright, Rudy Salas and Tyler Ness

Framing, cabinets, trim and tile are done by our own people. Licensed plumbers and electricians we've worked with for years do those parts.

What a Friday update looks like

Week 9 of 18, a bedroom and bath added on Quail Run (sample)

Done this week

  • Framing inspection passed
  • Roof tile on, matched to the house
  • Windows and the patio door set

Next week

  • Plumbing and wiring for the bath
  • Drywall delivery Thursday
  • Your pick: the shower tile

Photos

Jamal and Tyler raising a wall for the addition The new wing from the backyard Nate going over tile and cabinet samples with homeowners

Recent projects

Each one with the before, the after, and how the schedule went.

After: the opened kitchen with a white oak island and pendant lights Before: honey oak cabinets, laminate counters and a peninsula wall
After. The before photo is below.

A closed-in 1996 kitchen, opened to the family room

The peninsula wall came out and a beam went in, so the island could run the length of the room. The sink stayed under the window. New cabinets, counters, tile, lights and floors.

Planned11 weeks
Took11 weeks
Range (sample)$75k to $95k
Lived at home?Yes
Before: the old kitchen
After: a curbless walk-in shower, a white oak double vanity and hexagon floor tile Before: a beige cultured marble vanity and a tub with a sliding shower door
After. The before photo is below.

A tub nobody used, turned into a walk-in shower

We took the tub out, moved the drain and built a shower with no step to trip on. Old wiring turned up behind the wall; Victor sent photos and a price that afternoon, and it cost two days.

Planned5 weeks
Took5 weeks
Range (sample)$32k to $40k
Lived at home?Yes
Before: the old bathroom
After: a new room addition off the back of the house with a sliding door and a covered patio Before: a plain back wall with a small window and an old aluminum patio cover
After. The before photo is below.

A bedroom and bath for Mom, off the back of the house

About 400 square feet with its own bathroom and a door to the patio, matched to the house stucco and roof tile. A city inspection backlog cost one week; we said so the day we knew.

Planned18 weeks
Took19 weeks
Range (sample)$150k to $175k
Lived at home?Yes
Before: the back of the house

What we build

A whole-home remodel: living room opened to the kitchen under a new beam, oak floors and a white brick fireplace
Whole-home remodel, a wall out and a beam in
  • Kitchen remodels

    New finishes in the same layout, or walls moved and a new island.

  • Bathroom remodels

    Tub to walk-in shower, double vanities, safer bathrooms for staying in your home.

  • Room additions and casitas

    Bedrooms, suites and backyard casitas that match the house.

  • Whole-home remodels

    Several rooms on one schedule, so you move out once or not at all.

  • Garage conversions

    A finished room with insulation, cooling, windows and a real floor.

  • Drawings and permits

    We draw the plan, bring in the engineer when a wall carries weight, and pull the permits with the City of Niceton.

What people said at the walkthrough

4.9

Average of 63 Google reviews (sample)

“Victor's Friday texts were the best part. We always knew what week it was and what came next.”

Carla M., kitchen remodel sample review

“They found old wiring behind the shower wall. We had photos and a price the same afternoon, and the schedule barely moved.”

Greg and Tina P., primary bath sample review

“My mother moved into her new room the week they said, give or take one inspection.”

Dennis O., room addition sample review

“Dust walls up, floors covered, swept every day. We lived there the whole time.”

Priya S., whole-home remodel sample review

Questions people ask

Can we live at home during the remodel?

Usually, yes. For kitchens we set up a small temporary kitchen, for baths we plan around your other shower, and for big remodels we tell you up front which weeks are easier away.

Do we need an architect?

Not for most kitchens, baths and single-story additions. Nate draws the plan with you, and we bring in a structural engineer when a wall or roof carries weight.

Who handles the permits?

We do. Victor files with the City of Niceton, books every inspection and is there when the inspector comes.

How do payments work?

A deposit to get on the schedule, then payments tied to stages on your schedule, each one paid when that stage is done.

What if you find a problem behind a wall?

You hear about it the same day, with photos, a price and what it does to the schedule. Nothing extra gets done until you say yes.

Do you take small jobs?

We take on projects of a full room or bigger. For small repairs, we're glad to point you to a good handyman in town.

How soon can you start?

Design can usually start within two or three weeks. Build dates go on your schedule once the permit is in.

Start with a home visit

Tell us what you're thinking. We reply the same business day.

  1. Send a request or call.
  2. Nate visits, measures and listens. About an hour, no cost.
  3. Within a week you get a price range and a schedule in writing.

Two short steps. Add photos of the room if you have them.

Ask for a home visit